Level 2 Insulation and Building Treatments

Why?

PAS 2030:2019

PAS stands for ‘Publicly Available Specification

If you are wanting to install under the 2030:2019 standard, you will need (or your team will need) to achieve the Level 2 Insulation and Building Treatments qualification.  Once you have the standard, we can then offer you the specific pathway you are providing.  Pathways include:

 

  • Wall Tie Replacement
  • Solid Floor Insulation
  • Under Floor Insulation
  • Cold Roof Insulation
  • Damp Proofing

JWPS can support you through this process, until you have achieved the qualification in the pathway you require.  We understand that when people work in the trade, they prefer to be ‘on the tools’, rather than ‘in the classroom’. We have many years experience working with trade professionals and work with partners who can assist you with:

  • Obtaining the right paperwork (Quality Management System)
  • Ongoing support to complete the PAS standard in order to achieve certification

In addition to this, we can advise on the ‘Retrofit Process’ which is a requirement under the latest 2019 specification.

Quick Contact

Complete your details in the fields below and we will get back to you as soon as possible.